Reference list- camps
Tidal pool of camp Mareda, Novigrad
Size: | cca 300 m² |
Construction period: | 5/2013.- 7/2013. |
Camp Kozarica, Pakoštane
Size | cca 10.000 m² |
Construction period: | 3/2013.- 6/2013. |
Camp Sirena, Novigrad
Size: | 9.076 m² |
Construction period: | 2/2013.- 6/2013. |
Camp Mareda, Novigrad
Size: | 9.994,15 m² |
Construction period: | 2/2013 – 6/2013 |
Service: supervision.
Camp Neretva
Size: | 46.430 m² |
Period: | 11/2012- 12/2012 |
Size: Technical consultancy and design documentation control.
Camp Sirena, Novigrad
Size: | 9.500 m² |
Construction period: | 2/2012.- 5/2012. |
Service: supervision.
Camp Mareda, Novigrad
Size: | 9.606,0 m² |
Construction period: | 2/2011 – 4/2011 |
Service: supervision.